/ Free download · v1.0

Lift plan template. Blank. Structured. Free.

Thirteen pages of the document structure a competent person actually uses — cover, load data, crane duty, rigging, ground bearing, L×S risk, method, roles, sign-off. Aligned to BS 7121, LOLER 1998 and ASME B30.

This is not a lift plan. It does not authorise a lift. Do not take a blank or self-filled copy to site as the issued plan. A lift plan must be calculated and signed by a competent Appointed Person for that load, that crane, and that site.
Also free · 2 pages

Simple routine lift plan.

One crane. Known weight. Clear path. Job, chart check, rigging, sequence, shift sign-off. Stop at 75%, tandem, power lines or unknown load — that needs the signed study, not this sheet.

Also free · 2 pages

Lifting method statement.

Common safe-system text is already written. Fill only the [JOB] gaps — site, load, crane, path, names. Not an operator form. Critical lifts still need a signed study.

Also free · deck / platform

Offshore routine plan and start-work check.

Shorter sheets for everyday platform, deck and supply-boat lifts. JMR originals — not an operator form and not an official IOGP document. Still template only. Blind, tandem, over live plant or above 75% chart: stop and use a signed study.

01 — What's inside

Twelve sections. Every field a reviewer looks for.

The same skeleton we use on engineered JMR plans — emptied of numbers, left as a working form.

02 — How to use it

Duplicate. Fill. Then stop if you cannot sign it.

  1. 01

    Copy the master

    Save a new file with a plan number. Never overwrite the blank template.

  2. 02

    Fill or mark N/A

    Silent blanks on a safety document are a finding. If a field does not apply, write N/A.

  3. 03

    Attach the sketches

    Reach diagram on the site plan. Rigging sketch. Chart extract. A plan without drawings is not finished.

  4. 04

    Competent person signs

    If you are not the Appointed Person for this lift, send the brief to one. JMR will take it from template to a signed plan.

03 — Frequently asked

Template questions.

Is this a real lift plan I can use on site?

No. This is a blank document structure. It does not authorise a lifting operation. A lift plan must be prepared and signed by a competent Appointed Person for the specific load, crane, rigging and site.

Which standards is it aligned to?

Section order follows the engineering content expected under BS 7121, LOLER 1998 and ASME B30, with space for DNV-ST-N001 on offshore lifts. Alignment is structural — compliance lives in the numbers and the signature, not in the headings.

Can I put my company logo on it?

Yes, on your working copy. Leave the disclaimer on page 1. The footer may keep the JMR credit or you may replace it on a signed plan you take responsibility for.

Will JMR sign a form I filled in?

Not as a rubber stamp. If you engage us, we recalculate, redraw where needed, and sign our own revision. The template is a starting structure, not a shortcut around engineering.

04 — When the template is not enough

Need it signed. Send the load.

Preliminary crane selection and red flags within 48 hours — no cost, no obligation. The engineered plan is signed by a LEEA Certified Appointed Person.

contact@jmrlifting.com · 24-hour global response · Template v1.0 · August 2026